Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Mumbai–Delhi high-speed dream on pause: WR insists on full Kavach safety first

TNN | Last updated on - Nov 20, 2025, 15:11 IST
Comments
Share
1/10

Speed Limit Conditional on Kavach

Western Railway will allow trains to run at 160 kmph on the Mumbai-Ahmedabad-New Delhi corridor only after Kavach is fully installed, ensuring high-speed travel without compromising passenger safety. (PHOTO CREDIT: AI)

2/10

Track Upgrade in Progress

The corridor is undergoing advanced track upgrades to handle 160 kmph speeds. However, speed enhancement will only be approved after Kavach activation along the entire route. (PHOTO CREDIT: AI)

3/10

Safety Over Speed

Railway officials emphasised that safety comes before speed. High-speed operations without Kavach could expose passengers to severe risks in case of human error. (PHOTO CREDIT: AI)

4/10

Mumbai-New Delhi High-Speed Route

The Mumbai-New Delhi corridor, spanning 1,384 km, has been identified for 160 kmph operations, with Western Railway covering 694 km from Mumbai Central to Nagda. (PHOTO CREDIT: AI)

5/10

Virar-Vadodara Stretch Upgrade

The 390 km stretch between Virar and Vadodara is in final stages of track work. Speed is proposed to rise from 130 kmph to 160 kmph once Kavach is activated. (PHOTO CREDIT: AI)

6/10

Kavach System Overview

Kavach, meaning “armour,” is an indigenous anti-collision system. It continuously monitors train movement, automatically applying brakes in case of overspeed, collisions, or signal violations. (PHOTO CREDIT: AI)

7/10

Enhanced Safety in Low Visibility

Kavach provides a technological safety net that reduces risks during fog or low visibility, protecting passengers even when human vigilance may fail. (PHOTO CREDIT: AI)

8/10

Certified High Safety Standards

The system is certified at the highest safety integrity level, with a hazardous-failure probability of less than once in 10,000 years, ensuring maximum reliability. (PHOTO CREDIT: AI)

9/10

Installation Costs

Installing Kavach costs around Rs 50 lakh per km of track, while each locomotive requires approximately Rs 70 lakh for onboard equipment, reflecting the investment in safety. (PHOTO CREDIT: AI)

10/10

Risk Mitigation Benefits

Kavach significantly lowers accident risk on high-speed corridors by automatically controlling speed and preventing collisions, ensuring trains can operate safely at 160 kmph. (PHOTO CREDIT: AI)

Top Comment
D
Dfoxman
185 days ago
Enhancing infra and tech is one thing, but changing the Chalta hai/Chal Jaata hai mindset of the workers is quite another...so, until that happens, accidents will continue to plague the railways.
Read allPost comment
Photostories
  • How to delete stress from your life
  • 7 painful truths about love and relationships people often don't talk about
  • Pregnancy nutrition: Superfoods every mother-to-be should add to her plate
  • Bhindi to Lauki: Why we remove the crown of these 7 everyday vegetables
  • Vaibhav Sooryavanshi Home: Vaibhav Sooryavanshi's modest home in Samastipur, Bihar tells the story of hard work, determination and family sacrifices
  • 8 hill stations travellers should avoid during heavy monsoon in India and their safer alternatives
  • 8 places in the world that look AI-generated but exist in real life and and how to visit them
  • 5 classic hill stations in India that are also traffic nightmares
  • The body check: What workplace stress is secretly doing to your brain, heart and sleep
  • RCB reaches the IPL 2026 finale, and Virat Kohli celebrates the only way he knows – by twinning with Anushka Sharma
Explore more Stories
  • 8
    Mira Road housing society turns communal faultline amid Bakrid sacrifice row
  • 10
    After 11 years of traffic snarls, Hope Farm underpass work finally takes off in Bengaluru
  • 7
    Back on track: Mumbai Monorail gears up for June restart, trial runs begin on Wadala stretch
  • 8
    Kolkata metro orange line finally connects Chingrighata 62-metre missing link
  • 8
    Bengaluru East station roars back to life after massive rail makeover
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • Mumbai–Delhi high-speed dream on pause: WR insists on full Kavach safety first
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 27, 2026, 11.08PM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service