Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Meerut to Prayagraj in 6-7 hours: UP’s mega Ganga Expressway nears takeoff

TIMESOFINDIA.COM | Last updated on - Apr 21, 2026, 14:24 IST
Comments
Share
1/10

Inauguration date

The 594-km-long Ganga Expressway will be inaugurated formally for public use on April 29 by the Prime Minister Narendra Modi. (All Images by Salabh)

2/10

Meerut–Prayagraj in 6–7 hours

Once operational, the expressway will significantly reduce travel time between Meerut and Prayagraj to around 6–7 hours, compared to the current 10–12 hours.

3/10

Speed design

"Designed for speeds of up to 120 kmph, the expressway will cut down travel time between the two cities to approximately 6-7 hours from the current 10-12 hours," said an official.

4/10

UPEIDA leading the project

The Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) has overseen the construction and development of the expressway.

5/10

Road design

The expressway has been constructed as a 6-lane road, with provisions in place for future expansion to 8-lanes depending on traffic demand.

6/10

Land allocation

A 120-metre right-of-way has been used for the project, allowing space for lanes, service roads, and future infrastructure expansion.

7/10

Construction model

To ensure faster execution and quality control, the entire project has been divided into four construction packages.

8/10

Toll system

The expressway features two main toll plazas at Meerut and Prayagraj, along with 19 ramp toll plazas for convenient entry and exit points.

9/10

Public facilities

9 public utility complexes have been developed along the route, offering fuel stations, food courts, rest areas, and clean sanitation facilities.

10/10

Engineering highlights

The project includes a nearly 960-metre bridge over the Ganga and a 720-metre bridge over the Ramganga, engineered to handle flood conditions and water flow dynamics.

Start a Conversation

Post comment
Photostories
  • Smart furniture ideas for small homes that maximise space and style
  • Is Botox safe anymore? UKHSA issues warning after suspected botulism cases: 5 things to keep in mind while getting beauty jabs
  • 8 places in the world that look AI-generated but exist in real life and and how to visit them
  • 5 classic hill stations in India that are also traffic nightmares
  • 10 unique sea snakes and places they can be found on beach by travellers
  • Alia Bhatt and Ranbir Kapoor's home is a cosy mid-century abode with a flush of quirks: Art inspirations to take away
  • Success quote of the day by Chanakya: “A person should not be too honest..."
  • Hugs & hot idlis: Bonhomie before the big call? DK Shivakumar touches Siddaramaiah’s feet
  • The Microsoft interview question that nearly stumped Satya Nadella: Could you answer it?
  • 10 house names believed to attract wealth, prosperity and positive energy
Explore more Stories
  • 10
    Hugs & hot idlis: Bonhomie before the big call? DK Shivakumar touches Siddaramaiah’s feet
  • 8
    Mira Road housing society turns communal faultline amid Bakrid sacrifice row
  • 10
    After 11 years of traffic snarls, Hope Farm underpass work finally takes off in Bengaluru
  • 7
    Back on track: Mumbai Monorail gears up for June restart, trial runs begin on Wadala stretch
  • 8
    Kolkata metro orange line finally connects Chingrighata 62-metre missing link
Up Next
  • News
  • /
  • City
  • /
  • Lucknow
  • /
  • Meerut to Prayagraj in 6-7 hours: UP’s mega Ganga Expressway nears takeoff
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 28, 2026, 01.31PM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service