Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Traffic bottleneck relief in sight as Kalyan station flyover completes crucial milestone: All you need to know

Pradeep Gupta
| TNN | Last updated on - May 20, 2026, 16:23 IST
Comments
Share
1/10

Final girder launched in key SATIS flyover milestone near Kalyan station

Authorities have completed the launching of the final girder for the longest and most crucial flyover under the Station Area Traffic Improvement Scheme near Kalyan railway station, marking an important milestone aimed at easing long-standing congestion in the busy station area.

2/10

1.1-km flyover from Subhash Chandra Bose Chowk to Bailbazar Chowk near completion

The 1,125-metre-long flyover from Subhash Chandra Bose Chowk to Bailbazar Chowk has entered its final stage of construction. Officials said the structure, with a width ranging from 9 to 18 metres, will help improve traffic movement once completed.


3/10

Flyover built using advanced Malaysian UHPFRC technology

The structure has been constructed using Ultra-High Performance Fibre Reinforced Concrete (UHPFRC), a Malaysian technology also used in the Mumbai-Pune Missing Link project, known for its high strength and durability.

4/10

High-strength concrete designed for long lifespan and better resistance

Officials said UHPFRC offers five to six times higher compressive strength than conventional concrete and is highly resistant to weathering and pollution, giving the structure a lifespan of over 100 years.

5/10

SATIS project aimed at easing congestion near Kalyan station

The flyover is part of the Station Area Traffic Improvement Scheme designed to reduce heavy congestion outside Kalyan railway station and improve overall traffic flow in the area.


6/10

IIT Bombay provides technical support for design and safety

The flyover’s structural design and proof-checking were carried out with technical support from IIT Bombay, ensuring improved safety and durability standards.


7/10

Foot overbridge challenge resolved without disruption

Engineers faced a key challenge due to an existing foot overbridge at Pandit Jawaharlal Nehru Chowk. They used UHPFRC technology to complete girder launching without dismantling it or affecting pedestrian movement.


8/10

Night-time operation for final girder launch completed safely

The final girder launching was carried out late at night with civic officials, engineers, consultants, and contractors present to ensure smooth execution with minimal disruption.

9/10

Remaining SATIS flyovers also nearing completion

Officials said the other two flyovers under the SATIS project are also nearing completion. All three will be interconnected to improve traffic circulation in the station area.

10/10

Kalyan West station area project led by civic body

The project is being executed by the Smart Kalyan Dombivli Development Corporation Ltd as part of efforts to upgrade infrastructure and reduce congestion around the railway station.

Start a Conversation

Post comment
Photostories
  • 10 house names believed to attract wealth, prosperity and positive energy
  • Born on a Monday? What it reveals about your personality, money, love and future
  • Planning to buy an under-construction home? 10 things you must verify
  • Quote of the day by the Dalai Lama: “The training of the mind is an art. If this can be considered art, one’s life is art”
  • What is MahaRERA? 5 important things every homebuyer should know before booking a property
  • 6 foods that secretly absorb the most oil while cooking
  • 6 breathtaking but risky mountain passes in India with a very short travel window
  • Hard work isn't enough: 5 smart ways to achieve success
  • Bhagavad Gita thought of the day: "Calmness is not weakness”
  • UK Heatwave 2026: What to know if you’re taking painkillers, insulin, or antidepressants, and safety tips from the MHRA
Explore more Stories
  • 8
    Mira Road housing society turns communal faultline amid Bakrid sacrifice row
  • 10
    After 11 years of traffic snarls, Hope Farm underpass work finally takes off in Bengaluru
  • 7
    Back on track: Mumbai Monorail gears up for June restart, trial runs begin on Wadala stretch
  • 8
    Kolkata metro orange line finally connects Chingrighata 62-metre missing link
  • 8
    Bengaluru East station roars back to life after massive rail makeover
Up Next
  • News
  • /
  • City
  • /
  • Traffic bottleneck relief in sight as Kalyan station flyover completes crucial milestone: All you need to know
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 28, 2026, 10.59AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service